By the time the reaction survey goes out, most of the evaluation has already been decided.
Three mistakes are made earlier, in scoping:
- No decision rule. If nobody agreed in advance which result would trigger which action, the report becomes a verdict nobody uses.
- Wrong unit of analysis. A problem that lives in a process or a team gets measured on individual learners, so the data cannot answer the question that was actually asked.
- Measuring what is convenient. Confidence ratings are cheap to collect; changed behaviour under real workload is expensive and far more informative.
None of this is a data problem. It is a contracting problem: sponsor, designer and evaluator need to agree what evidence would change their minds before design starts.
For a trainer, that means naming the decision in the room. For an instructional designer, it means building the evidence into the tasks rather than bolting it on. For an L&D manager, it means holding the sponsor to a rule instead of a feeling.
What decision is your current evaluation actually designed to support?