Most successful pilots are scaled by subtraction. A programme works with twelve volunteers, weekly coaching, a manager who checks in, and a facilitator who improvises. To reach six hundred people, the coaching becomes a PDF, the manager gets a reminder email, the facilitator becomes a video, and the volunteers become everyone. The logic is cost per head. The casualty is the mechanism.
A pilot is not a small version of a programme. It is a bundle of conditions, and some of them are quietly doing the work. Before scaling, list what actually produced the result — practice with feedback, peer accountability, protected time, a manager who noticed — then ask which of these survive the new model.
- Trainers notice first when the room disappears.
- Designers watch feedback become an automated quiz.
- L&D managers carry the cost-per-head conversation.
- HR leaders decide whether managers are still expected to show up.
Scaling should remove convenience, not the active ingredient. What did your last scale-up quietly delete?
Comments 0
Sign in to like, save or comment.
No comments yet. Start the discussion.